We provide comprehensive services in Electrical sector
(SCADA, Communication, Power Generation, and Transmission &Distribution)
ASL.AMD Specializes on SCADA. In addition, we focuses on the following areas of SCADA.
Installation of the new RTU, SOE, Transducer and communications panels and make the local test, make the commissioning (end-to-end) test with the protocol analyzer-testing tool AEC2000 under the witnessing of SEC engineer, than we clearing the punch list of SEC.
In addition, we can make the upgrade work for the RTU200 & RTU232 up to RTU560, So no need to do complete test for old points.
Make the extension on the RTU560 for the remote end, adding the racks and modulo, and make the confirmation update, then the commissioning (end-to-end) test with the protocol analyzer testing tool (AEC2000) under the witnessing of SEC engineer.
Replace the old RTU (FOX PORO & MAICRO SOL) with the new RTU560 by Dismantling of Old Panel for the old sup station, Install new RTU Panels, and make the commissioning (end-to-end) test with the protocol analyzer-testing tool AEC2000 under the witnessing of SEC engineer.
We have good relationships with a group of suppliers in multiple fields such as fealty recorded, DCM Protection and control commuitioning, Measurement systems, and we can supply ABB modules, TILLQUSIT transducers and In addition SEWE transducers.
AT ASL.AMD WE BELIVE THAT PROJECT MANAGEMENT IS CRUCIAL, RELIABLE, REPEATABLE PROCESS TO DELIVERON TIME, ON BUDGET AND WITHIN PROJECT SCOPE. WE LOOK AT THE PROCESS OR PROJECT LIFE CYCLE AND TRY TO GUIDE CLIENTS AND SUB-CONTRACTORS ALONG A CHARTED PATH OF PRIOR PROJECT PROCESS STANDARDS
IN DEPTH STUDY TO DEFINE A NEW PROJECT OR NEW PHASE OF AN EXITING PROJECT BY CLEARLY UNDER STANDING THE SCOPE OF WORK AND REQUIREMENTS
STRATEGIZE THE REQUIRED STEPS TO ESTABLISH THE SCOPE OF THE PROJECT, REFINE THE OBJECTIVES, AND DEFINE THE COURSE OF ACTION REQUIRED TO ATTAIN THE OBJECTIVES THAT THE PROJECT WAS UNDERTAKEN TO ACHIEVE
REGULARLY TRACK, REVIEW, AND REGULATE THE PRO GRESS AND PERFORMANCE OF THE PROJECT: IDENTIFY ANY AREAS IN WHICH CHANGES TO THE PLAN ARE REQUIRED: AND INITIATE THE CORRESPONDING CHANGES.
REGULARLY TRACK, REVIEW, AND REGULATE THE PRO GRESS AND PERFORMANCE OF THE PROJECT: IDENTIFY ANY AREAS IN WHICH CHANGES TO THE PLAN ARE REQUIRED: AND INITIATE THE CORRESPONDING CHANGES.
Expansion, Modification, Renaming, Relabeling of RTU according to the required electrical, control, protection modifications the existing SCADA RTUABB 560
Expansion/Modification of SCADA/RTU in Remote End Substations (S/S 8064 & S/S 8124) -As per tender Documents/Site requirements including Design, Engineering- Installation Supervision Expansion/Modification
Replace the old RTU with new ABBRTU500 and Supply, Installation supervision, testing & commissioning for the new RTU.
- Upgrade to the old RTU
Installations supervision of RTU upgrade
- Make the configuration of the new RTU560 as per the SPL.
– Make the testing to the RTU560.
– Clear the bunch lest
- Upgrade to the old RTU
Installations supervision of RTU upgrade
- Make the configuration of the new RTU560 as per the SPL.
– Make the testing to the RTU560.
– Clear the bunch lest
We pride ourselves on the trust of major companies and institutions in our solutions and services
Saudi Emaar Co.
Innovative Systems Co.
Saudi Electricity Co.
Alfanar Co.
Saudi Services Co.
We're ready to assist you with your projects and inquiries
Industry Street, Riyadh, Saudi Arabia
+966580008276 - +966549922224
info@aslamd.com
Sun - Thu: 8AM - 5PM